PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Hot water supply - return piping at the 4th floor Facing West.jpg Installed metal clips along the top roof perimeter for the parapet Facing East.jpg Installed sheet rock at the lower roof Facing West.jpg Installed the hot water supply and return at the 2nd - 4th floor Facin West.jpg Installing ductwork fitters at the 2nd floor Facing North.jpg
Previous page Installing ductwork fitters at the 2nd floor Facing North
Installing ductwork fitters at the 2nd floor Facing North